QUALITY CONTROL
SECTION
It consists of four major sections:
1. Chemical Section
2. Components Section
3. R & D Section
4. Microbiological Section
The whole system is run by well qualified and experienced
Chemists, Pharmacists and Microbiologists.
Important Quality Instruments and view of the laboratory:
|
|

Spectrophotometer |
| |
|
|
Quality
Techniques for Pharmaceutical Manufacturing
In the modern world these techniques play important role to
stream line the manufacturing processes and create more
confidence in the products. We give high emphasis to these
concepts.
1. In Vitro Drug Dissolution Testing
Dissolution may be defined as the amount of substance (Drug)
that goes in to a solution per unit time under standardized
condition of solvent composition and agitation (Stirring).
2. Shelf Life and Stability Testing of Pharmaceuticals
There is high variation of climatic conditions in our country
and awareness about the medicines storage is limited. Therefore
it is essential the product must be tested for stability in
variable conditions of temperature and humidity.
The scientific content will include aspects of setting a
stability program, storage conditions, and examination
intervals, analytical procedures to determine purity and to
detect impurities, material specifications and packaging
consideration. The effective use of resources will be covered
through the planning f the stability program. We are well
equipped to carry out stability process. |
|
|
| |
|
|
 |
|
|
| |
|
|
Shelf Life
and Stability Testing of Pharmaceuticals
There is high variation of climatic
conditions in our country and awareness about the medicines
storage is limited. Therefore it is essential the product must
be tested for stability in variable conditions of temperature
and humidity.
The scientific content will include aspects of setting a
stability program, storage conditions, and examination
intervals, analytical procedures to determine purity and to
detect impurities, material specifications and packaging
consideration. The effective use of resources will be covered
through the planning of the stability program. We are well
equipped to carry out stability process |
|
|
| |
|
|
Innovation
in packaging
Hologram is not only providing brand
security but also contribute in to packaging Aesthetics hence
provide better Brand Value.
Packing designing is an art, which required lot of knowledge
about market trend and acceptability.
Quality Assurance Laboratory has separate packing components
section; which is responsible for components selection and test
the suitability according to the formulation of drug. |
|

R.O Water Plant |
| |
|
|
LIST OF IMPORTANT
PRODUCTS IN THE FORM OF TABLETS
1.
Caborin 35mg (Mebeverine HCl)
2.
Citrovic 'C' 500mg (Ascorbic Acid)
3.
Athroxen 250/500mg (Naproxen Sodium)
4.
D-Mycin 250/500mg (Erythromycin Stearate)
5.
Ulcocid 500mg/1gm (Sucralfate)
6.
Juvel (Multi Vitamins)
7.
Metformina 500/850/1gm (Metformin HCl)
8. Sulforin DS Tablets (Sulphamethoxazole & Trimethoprim)
9.
Losratan 250/500mg (Losartan Potassium)
10.Lipostat 10/20/40mg (Simvastatin)
11.Dypon (Paracetamol & Dextropropoxyphene)
12.Tylofenac 50mg (Diclofenac Sodium) |
|

Products in Form of
Tablets |
| |
|
|
LIST OF
IMPORTANT PRODUCTS IN LIQUID SECTIONS
1. Lactodil 120/240ml Lactulose
2. Tylol Suspension Paracetamol
3. Tylol Drops Paracetamol
4. Ulcocid Suspension Sucralfate
5. Laxolax Drops Sodium Pico Sulphate
6.
Leptil Syrup Sodium Valproate
7. Orolin Cough Syrup
8. Orolin DM Syrup
|
|

Auto Liquid Filling
Machine |
| |
|
|
HVAC System
It is essential to create suitable environment in the
manufacturing area to produce good quality products. HVAC System
normally consists of following factors, which we have
implemented in our factory:
i.
Air conditioning
ii.
Dust Collecting
iii.
Humidity Control
iv.
Bio-Burden (Minimum Rate)
v.
Air Changes / hr.
vi.
Differential Pressure
BACK UP
SERVICES
Well equipped and trained technical staff is available for the
maintenance of the plant. The workshop has large area to carry
out maintenance. Following bellow is detail of staff.
1.
Maintenance Engineer
2.
Mechanical Supervisor
3.
Electrical Supervisor
4.
A/C Supervisor
5.
Boiler Engineer |
|
 |
| |
|
|