Home
The Best Pharmaceuticals Company in Your Region
 
 
QUALITY CONTROL SECTION
It consists of four major sections:
1. Chemical Section
2. Components Section
3. R & D Section
4. Microbiological Section

The whole system is run by well qualified and experienced Chemists, Pharmacists and Microbiologists. Important Quality Instruments and view of the laboratory:

 
 


Spectrophotometer

     
Quality Techniques for Pharmaceutical Manufacturing

In the modern world these techniques play important role to stream line the manufacturing processes and create more confidence in the products. We give high emphasis to these concepts.

1. In Vitro Drug Dissolution Testing
Dissolution may be defined as the amount of substance (Drug) that goes in to a solution per unit time under standardized condition of solvent composition and agitation (Stirring).

2
.
Shelf Life and Stability Testing of Pharmaceuticals
There is high variation of climatic conditions in our country and awareness about the medicines storage is limited. Therefore it is essential the product must be tested for stability in variable conditions of temperature and humidity. The scientific content will include aspects of setting a stability program, storage conditions, and examination intervals, analytical procedures to determine purity and to detect impurities, material specifications and packaging consideration. The effective use of resources will be covered through the planning f the stability program. We are well equipped to carry out stability process.
   
     
   
     
Shelf Life and Stability Testing of Pharmaceuticals

There is high variation of climatic conditions in our country and awareness about the medicines storage is limited. Therefore it is essential the product must be tested for stability in variable conditions of temperature and humidity.

The scientific content will include aspects of setting a stability program, storage conditions, and examination intervals, analytical procedures to determine purity and to detect impurities, material specifications and packaging consideration. The effective use of resources will be covered through the planning of the stability program. We are well equipped to carry out stability process
   
     
Innovation in packaging

Hologram is not only providing brand security but also contribute in to packaging Aesthetics hence provide better Brand Value.
Packing designing is an art, which required lot of knowledge about market trend and acceptability. Quality Assurance Laboratory has separate packing components section; which is responsible for components selection and test the suitability according to the formulation of drug.
 


R.O Water Plant

     
LIST OF IMPORTANT PRODUCTS IN THE FORM OF TABLETS

1.  Caborin 35mg (Mebeverine HCl)
2.  Citrovic 'C' 500mg (Ascorbic Acid)
3.  Athroxen 250/500mg (Naproxen Sodium)
4.  D-Mycin 250/500mg (Erythromycin Stearate)
5.  Ulcocid 500mg/1gm (Sucralfate)
6.  Juvel (Multi Vitamins)
7.  Metformina 500/850/1gm (Metformin HCl)
8.  Sulforin DS Tablets (Sulphamethoxazole & Trimethoprim)
9.  Losratan 250/500mg (Losartan Potassium)
10.Lipostat 10/20/40mg (Simvastatin)
11.Dypon (Paracetamol & Dextropropoxyphene)
12.Tylofenac 50mg (Diclofenac Sodium)
 


Products in Form of Tablets

     
LIST OF IMPORTANT PRODUCTS IN LIQUID SECTIONS

1. Lactodil 120/240ml Lactulose
2. Tylol Suspension Paracetamol
3. Tylol Drops Paracetamol
4. Ulcocid Suspension Sucralfate
5. Laxolax Drops Sodium Pico Sulphate
6. Leptil Syrup Sodium Valproate
7. Orolin Cough Syrup
8. Orolin DM Syrup
 


Auto Liquid Filling Machine

     
HVAC System

It is essential to create suitable environment in the manufacturing area to produce good quality products. HVAC System normally consists of following factors, which we have implemented in our factory:

i.  Air conditioning
ii. Dust Collecting
iii. Humidity Control
iv. Bio-Burden (Minimum Rate)
v. Air Changes / hr.
vi. Differential Pressure

BACK UP SERVICES

Well equipped and trained technical staff is available for the maintenance of the plant. The workshop has large area to carry out maintenance. Following bellow is detail of staff.

1. Maintenance Engineer
2. Mechanical Supervisor
3. Electrical Supervisor
4. A/C Supervisor
5. Boiler Engineer
 

     

 
| Home | About Us | Manufacturing Facilities | Journey Through Factory |
 | Achievements | Careers at Don Valley | Latest Studies | Contact Us |

Copyright@2008 Don Valley